News

The San Martín Road Consortium was awarded the bid for the maintenance of the Huallaga Central-San Martín Regional Road Network

The Peruvian company Ingenieros Civiles y Contratistas Generales S.A. (ICCGSA), with 48 years of experience in the construction sector and pioneer in the road maintenance services in the country, was awarded the bid to carry out the maintenance and improvement of seven sections of the Huallaga Central Logistic Corridor, which belongs to the Regional Government of San Martín.

The performance of this contract, the cost of which is 236,548,973 nuevos soles, will be under the responsibility of the San Martín Road Consortium, which is led by the company ICCGSA. Works will consist of improving and ensuring proper trafficability in various sections with a total length of 181.38 Km. of the Huallaga Central-San Martín Regional Road Network for five years.

The San Martín Road Consortium informs that this contract is referred to maintaining the existing road structure. Therefore, no changes will be made to the highway layout.

The maintenance and improvement of the Huallaga Central-San Martín Regional Road Network will be completed in the following routes:

- Route SM 118: Emp. 5N (Bellavista) – Pte. Bellavista – San Benito – Nuevo Mundo – Puente Nuevo Mundo – Emp. SM 108 (San Francisco).

- Route SM 108: Nuevo Lima – Cusco – Barranca

- Route SM 107: Tingo de Ponasa – Shamboyacu

- Route SM 119: Ledoy – Pajarillo – San José de Juñao – Dos Unidos - Huancamayo - Capirona – Pampa Hermosa – Alto Cuñumbaza.

- Route SM 103 and SM 117: Emp. SM 103 (Piscoyacu) – Dv. San Lorenzo – Shapumba – Emp. SM 103 - Nuevo Sacanche – La Primavera – Santa Rosa – Agua Azul – El Dorado

- Route SM 120: Emp. 5N (Pte. Santa Martha) Pachiza – Huicungo.

- Route SM 119: Emp. SM 118 (Dv. Pte. Bellavista) – Sector Cerro Blanco – Ledoy.

Gallery